10 CFR 431—Energy Efficiency Program For Certain Commercial And Industrial Equipment
United States of America*
Washing Machines, Streetlighting, Air Compressors, 3-Phase Motors, 1-Phase Motors, Heat Pumps, Boilers and Furnaces, Portable ACs, Packaged Terminals, Central ACs, Instantaneous Water Heaters, Storage Water Heaters, Building Circulator Pumps, Pump Systems, Pool Pumps, Power Transformers, Walk-In Coolers and Freezers, Refrigerators-Freezers, Refrigerated Vending Machines, Ice Machines, Freezers-only
Mandatory
Minimum Performance Standard
Entered into force, Adopted, Revised
1994
2023
December 2020
Electricity
Commission Delegated Regulation (EU) 2019/2016 of 11 March 2019 supplementing Regulation (EU) 2017/1369 of the European Parliament and of the Council with regard to energy labelling of refrigerating appliances
United Kingdom
Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Comparative Label
Entered into force, Adopted
2019
October 2023
Electricity
Commission Delegated Regulation (EU) 2019/2016 of 11 March 2019 supplementing Regulation (EU) 2017/1369 of the European Parliament and of the Council with regard to energy labelling of refrigerating appliances
European Union
Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Comparative Label
Entered into force, Adopted
2019
September 2023
Electricity
Commission Regulation (EU) 2019/2019 of 1 October 2019 laying down ecodesign requirements for refrigerating appliances pursuant to Directive 2009/125/EC of the European Parliament and of the Council and repealing Commission Regulation (EC)
European Union
Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2019
September 2023
Electricity
Draft standard PROY-NOM-014-ENER-2020
Mexico
1-Phase Motors
Mandatory
Minimum Performance Standard
Under development
December 2023
Electricity
Electric Motors Minimum Energy Performance Standards
Pakistan
3-Phase Motors, 1-Phase Motors
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2020
February 2021
Electricity
Energy Efficiency Regulations, 2016 (SOR/2016-311)
Canada
Audio-Visual, Televisions, Displays, Battery Chargers, External Power Supply, Dehumidifiers, Ovens, Microwaves, Dishwashers, Cooktops or Hobs, Clothes Dryers, Washer and Dryers, Washing Machines, Indoor Luminaires, Specialty Luminaires, Specialty Lamps, Non-Directional lamps, Fluorescent and HID Lighting, 3-Phase Motors, 1-Phase Motors, Ventilation, Ceiling Fans, Space Heating, Heat Pumps, Boilers and Furnaces, Room ACs - Stationary ACs, Portable ACs, Packaged Terminals, Chillers - Cooler Towers, Central ACs, Instantaneous Water Heaters, Storage Water Heaters, Pump Systems, Power Transformers, Distribution Transformers, Wine Chillers, Walk-In Coolers and Freezers, Refrigerators-Freezers, Refrigerated Vending Machines, Ice Machines, Freezers-only
Mandatory
Comparative Label, Minimum Performance Standard
Entered into force, Adopted, Revised
2016
2019
October 2022
Electricity, Gas, Oil
FDNIS ECOSTAND 071-1:2017EE: Minimum Energy Performance Standards Part 1: Refrigerating products
ECOWAS
Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Comparative Label, Minimum Performance Standard
Entered into force, Adopted
2017
October 2019
Electricity
GN 11/2017: Energy Efficiency (Labelling of Regulated Machinery) Regulations 2017 - amended by GN No. 137 of 2018
Mauritius
Ovens, Dishwashers, Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Comparative Label
Entered into force, Adopted, Revised
2019
2019
November 2020
Electricity
High Energy Performance Label for 1 phase motor
Thailand
Motors and Motor Driven Equipment, Motors, 1-Phase Motors
Voluntary
Comparative Label
Entered into force, Adopted
2022
April 2022
Electricity
High-efficiency Appliances Certification Program
Republic of Korea
1-Phase Motors
Voluntary
Endorsement Label
Entered into force, Adopted, Revised
1996
2012
January 2016
Electricity
ISIRI 7874, 1st Edition, Specification for energy consumption and energy labeling of single phase electrical motors
Iran
1-Phase Motors
Mandatory
Comparative Label, Minimum Performance Standard
Entered into force, Adopted, Revised
2012
2012
January 2016
Electricity
JS1 Part 21:2015 Jamaican Standard Specification for Labelling of commodities Part 21: Energy Labelling of appliances and products
Jamaica
Room ACs - Stationary ACs, Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Comparative Label
Entered into force, Adopted, Revised
1996
2017
November 2019
Electricity
JS178:2016: Jamaican Standard Specification for Determination of energy consumption and other performance characteristics of household refrigerators, freezers, wine chillers and refrigerator-freezers
Jamaica
Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Minimum Performance Standard
Entered into force, Adopted, Revised
1996
2017
November 2019
Electricity
LI 2456 Energy Commission (Energy Efficiency Standards and Labelling) (Electric Motors) Regulations, 2022
Ghana
3-Phase Motors, 1-Phase Motors
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2022
March 2023
Electricity
Low-voltage single-phase inductive motor energy efficiency ratio standards
Taiwan of China
1-Phase Motors
Voluntary
Minimum Performance Standard
Entered into force, Adopted, Revised
1981
2002
August 2018
Electricity
Minimum Energy Performance Standards for Low-Voltage Single-Phase Inductive Motors
Taiwan of China
1-Phase Motors
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2002
October 2022
Electricity
MS: 201:2012 Energy efficiency and labelling requirement-Household refrigerating appliances
Mauritius
Wine Chillers, Refrigerators-Freezers, Freezers-only
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2012
November 2020
Electricity
NOM-014-ENER-2004
Mexico
1-Phase Motors
Mandatory
Minimum Performance Standard
Entered into force, Adopted, Revised
1997
2005
December 2023
Electricity
NOM-033-ENER-2019 - AC motors cooled with air
Mexico
1-Phase Motors
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2021
December 2023
Electricity