JS 2111:2013 Technical Regulation on eco-design requirements for no-load condition electric power consumption and average active efficiency of external power supplies
Jordan
External Power Supply
Mandatory
Minimum Performance Standard
Entered into force, Adopted, Revised
2013
2014
June 2021
Electricity
LI 2452 Renewable Energy (Standards and Labelling) (Renewable Energy Batteries) Regulations, 2022
Ghana
Battery Chargers
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2022
March 2023
Electricity
LI 2461 Renewable Energy (Standards and Labelling) (Inverters) Regulations, 2022
Ghana
Solar Inverters
Voluntary
Minimum Performance Standard
Entered into force, Adopted
2022
March 2023
Electricity, Solar
SI 4665-2 PERFORMANCE OF EXTERNAL POWER SUPPLIES: MINIMUM ENERGY PERFORMANCE STANDARD (MEPS) REQUIREMENTS
Israel
External Power Supply
Mandatory
Comparative Label, Minimum Performance Standard
Entered into force, Adopted, Revised
2007
2011
October 2022
Electricity
SRO 604(I)/2019 Import Policy on Solar Equipment
Pakistan
Solar Inverters, Solar Stoves, Solar Water Pumps, Solar Energy Kits
Mandatory
Minimum Performance Standard
Entered into force, Adopted
2019
October 2019
Solar